Unfinished Milestones for US CMS Tier-2 Program
These are the milestones whose completion is still pending.
5/1/06 -- All sites upgrade to OSG 0.4.1
- Completed by all except MIT
7/1/06 -- 3-day use of 50% of baseline bandwidth by all sites, one at a time
- DONE through the SC4 load tests, 2/6/07
- DONE through the SC4 load tests, 2/6/07
- DONE through the SC4 load tests, 2/6/07
- Now moving into the context of Debugging Data Transfers task force
- Demonstrated at all but Caltech, Florida
- We are watching!
- We are watching!
- DONE 8/6/07
- DONE
- DONE, 7/8/07
- DONE, 6/26/07
9/15/07 -- Deploy OSG 0.8.0
- Probably will be postponed, waiting for the release
10/1/07 -- 90% success of PhEDEx transfers
11/1/07 -- Host MTCC3 datasets
12/1/07 -- dCache upgrade for SRM 2.2
1/1/08 -- Host pilot run datasets
- Pilot run has been cancelled.